PROJECTS
Projects 9-16
13. Waste Composting Facility at Water Beach, Cambridge
CLIENTS
Waste Composting Facility at Water Beach, Cambridge
Project:
£30 million waste composting facility to process 188,000 tonnes of waste a year. It will "put Cambridgeshire at the forefront of managing waste."
Role:
The complete architectural and engineering design including reception hall, preparation building and visitor centre.
Client:
Donarbon